Difficulty
Moderate
Steps
25
Time Required
3 hours
Sections
1
- SPM Vent Kit
- 25 steps
Flags
0
BackZoll Impact Uni-Vent 731
Full Screen
Options
History
Save to Favorites
Download PDF
Edit
Translate
Get Shareable Link
Embed This Guide
Notify Me of Changes
Stop Notifications
Introduction
For more information on replacing the SPM Vent kit, please refer to page 21 in the service manual.
What you need
Step 1
SPM Vent Kit
- Loosen but do not remove the(4) 8-32 X 3 screws on the outer air intake.
Loosen but do not remove the(4) 8-32 X 3 screws on the outer air intake.
1024
Step 2
- Loosen and remove the (2) 10-32 Keps nuts and the (4) 6-32 X 2 screws. Remove the back case by lifting from the ventilator.
Loosen and remove the (2) 10-32 Keps nuts and the (4) 6-32 X 2 screws. Remove the back case by lifting from the ventilator.
Step 3
- Remove the (2) 4-40 X ¼ screws on the Dovetail Mounting Bracket and disconnect the ribbon cable on the PIM PCB by simultaneously applying pressure on the two locking “ears”.
Remove the (2) 4-40 X ¼ screws on the Dovetail Mounting Bracket and disconnect the ribbon cable on the PIM PCB by simultaneously applying pressure on the two locking “ears”.
Step 4
- Flip the ventilator over and remove the front case assembly by lifting it straight up away from the ventilator module.
Flip the ventilator over and remove the front case assembly by lifting it straight up away from the ventilator module.
Step 5
- Remove the battery compartment cover by unscrewing the (4) 6-32 X 5/16 screws.
Remove the battery compartment cover by unscrewing the (4) 6-32 X 5/16 screws.
Step 6
- Remove the battery by unscrewing the (4) 6-32 X 2 ¼ screws and detaching the plug from its lockinglatch.
Remove the battery by unscrewing the (4) 6-32 X 2 ¼ screws and detaching the plug from its lockinglatch.
Step 7
- Unscrew the (4) 6-32 X 5/16 Phillips screws to remove the damaged battery compartment case.
Unscrew the (4) 6-32 X 5/16 Phillips screws to remove the damaged battery compartment case.
Step 8
- Loosen and remove the (2) 4-40 X 1 ¼ Screws and nylon spacers supporting the Power Input assembly unto the chassis
Loosen and remove the (2) 4-40 X 1 ¼ Screws and nylon spacers supporting the Power Input assembly unto the chassis
Step 9
- Loosen and remove the (2) 6-32 X ¼ screws holding the chassis to the dovetail mounting bracket and remove the SPO2 insulator. Loosen and remove the (2) 8-32 X ¼ screws holding the chassis to the vent module
Loosen and remove the (2) 6-32 X ¼ screws holding the chassis to the dovetail mounting bracket and remove the SPO2 insulator. Loosen and remove the (2) 8-32 X ¼ screws holding the chassis to the vent module
Step 10
- Insert screwdriver through the holes on the chassis to loosen and remove the (2) 6-32 x 5/16 screws holding the chassis to the vent module.
Insert screwdriver through the holes on the chassis to loosen and remove the (2) 6-32 x 5/16 screws holding the chassis to the vent module.
Step 11
- Lift the damaged chassis from the ventilator module.
Lift the damaged chassis from the ventilator module.
Step 12
- Disconnect the Power Input cable from the PIM PCB by pressing on the locking latch and pulling the cable straight up from the connector.
Disconnect the Power Input cable from the PIM PCB by pressing on the locking latch and pulling the cable straight up from the connector.
Step 13
- Remove the PIM PCB by loosening the (5) 4-40 X 5/16 screws.
Remove the PIM PCB by loosening the (5) 4-40 X 5/16 screws.
Step 14
- Remove the Dovetail stabilizer bracket by loosening and removing the (2) 6-32 x ¼ and the (2) 4-40 X ¼ screws.
Remove the Dovetail stabilizer bracket by loosening and removing the (2) 6-32 x ¼ and the (2) 4-40 X ¼ screws.
Step 15
- Install the dovetail stabilizer bracket ontothe new SPM assembly by tightening the (2) 6-32 X ¼ and (2) 4-40 X ¼ screws.
Install the dovetail stabilizer bracket ontothe new SPM assembly by tightening the (2) 6-32 X ¼ and (2) 4-40 X ¼ screws.
Step 16
- Secure the PIM Board to the new SPM with the (5) 4-40 x 5/16 screws.
Secure the PIM Board to the new SPM with the (5) 4-40 x 5/16 screws.
Step 17
- Secure the chassis to the vent module using the (2) 6-32 X ¼ screws with SPO2 insulator, the (2) 8-32 X ¼ and the (2) 6-32 x 5/16 screws.
Secure the chassis to the vent module using the (2) 6-32 X ¼ screws with SPO2 insulator, the (2) 8-32 X ¼ and the (2) 6-32 x 5/16 screws.
Step 18
- Secure the Power Input assembly to the Chassis using the (2) spacers and (2) 4-40 X 1 ¼ screws. Do not over-tighten the screws.
Secure the Power Input assembly to the Chassis using the (2) spacers and (2) 4-40 X 1 ¼ screws. Do not over-tighten the screws.
Step 19
- Rotate battery compartment to mate with upper and lower case cutouts and press firmly into place. Secure with (4) 6-32 X 5/16 screws provided
Rotate battery compartment to mate with upper and lower case cutouts and press firmly into place. Secure with (4) 6-32 X 5/16 screws provided
Step 20
- Re-assemble the battery by connecting its cable to the connector (pull on cable to insure it is locked in place) then tightening the (4) 6-32 X 2 ¼ screws.
Re-assemble the battery by connecting its cable to the connector (pull on cable to insure it is locked in place) then tightening the (4) 6-32 X 2 ¼ screws.
Step 21
- Re-assemble the battery compartment cover by tightening the (4) 6-32 X 5/16 screws.
Re-assemble the battery compartment cover by tightening the (4) 6-32 X 5/16 screws.
Step 22
- Place the front case assembly over the vent module and tighten the (2) 4-40 X ¼ screws unto the dovetail mounting bracket. Reconnect the ribbon cable unto the PIM PCB. Make sure the two locking “ears” lock into position.
Place the front case assembly over the vent module and tighten the (2) 4-40 X ¼ screws unto the dovetail mounting bracket. Reconnect the ribbon cable unto the PIM PCB. Make sure the two locking “ears” lock into position.
Step 23
- Attach the back case to the vent module and align cover with handle, air intake housing and dovetail mounting studs. Insert and tighten the included (2) 10-32 Keps nuts and the (4) 6-32 X 2” screws.
Attach the back case to the vent module and align cover with handle, air intake housing and dovetail mounting studs. Insert and tighten the included (2) 10-32 Keps nuts and the (4) 6-32 X 2” screws.
Step 24
- Tighten the (4) 8-32 X 3 screws on the outer air intake.
Tighten the (4) 8-32 X 3 screws on the outer air intake.
Step 25
- Perform HiPot Testing then perform Calibration and Functional Test using the RCS.
Perform HiPot Testing then perform Calibration and Functional Test using the RCS.
To reassemble your device, follow these instructions in reverse order.
Cancel: I did not complete this guide.
One other person completed this guide.
Author
with 1 other contributor
Brandon Drury
Member since: 05/04/2020
391 Reputation
1 Guide authored
Badges:
5
+2 more badges
Team
Cal Poly, Team S1-G5, Zimmerman Spring 2020
Member of Cal Poly, Team S1-G5, Zimmerman Spring 2020
CPSU-ZIMMERMAN-S20S1G5
5 Members
5 Guides authored
fayezhmc - Jan 31, 2022
Reply
Hi
What is the service passcode to reset the PM clock?